EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Utah-Jay
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (285)
Boot Cowl
- (17)
Workshop
- (1)
Empennage
- (2)
Fuselage
- (69)
Firewall
- (4)
Tail Feathers
- (9)
Wings
- (9)
Controls
- (17)
Avionics
- (35)
Lighting
- (3)
Instrument Panel
- (2)
Landing Gear
- (16)
Engine
- (30)
Propeller
- (1)
Fuel System
- (8)
Interior Finish
- (8)
Paint / Decals
- (8)
Inspection
Tools
- (1)
Engine Cowl
- (31)
Doors
- (1)
Baffling
- (12)
-
Baffle Seal
-
95% done with...
-
Silicone sheets...
-
Rear seal installation
-
Silicone to baffling
-
Final baffle day,...
-
Air Ducts plumbed
-
Left Front Ramp
-
Cabin heat, oil...
-
Trimmed sides and...
-
Front Ramp baffling...
-
Baffling
Cabin Air
- (1)
Builder Name:
JAY TOWNSEND
-
Project:
Companion
-
VIEW REPORTS
Total Hours:
1317.5
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Oct 21, 2021 - No Finish Date
Engine:
Barrow Lycoming O-360
Propeller:
Sensenich 82” GA
Panel:
Dynon
Friendly URL:
https://eaabuilderslog.org?s=Utah-Jay
Home or Last Project Picture
Aug 31, 2023
Rear seal installation
- (4 hours)
Category: Baffling
Of course there was more more on the engine cooling
IMG_4672.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.